The Carpentry Tip That Can Replace An Entire Employee: Shop Build #13
A video on YouTube. In DIY & Home Repair, a Krater category.
Watch on YouTubeSummary by Krater
The host reviews plans and installs 2x10 joists and tongue-and-groove OSB subflooring for a shop build, explaining layout spacing and fastening techniques.
From the video
Answers: How do you install joists and subflooring for a shop build?
- joist installation
- subfloor installation
- lumber grading
- framing techniques
What it concludes
- 16-inch joist spacing is sturdier and prevents bouncy floors compared to 19.2-inch spacing.
- Using a nail gun, block, or shelf significantly saves time and money compared to having someone hold joists.
- Bostik PL400 subfloor adhesive provides a stronger bond and holds up better than liquid nail products.
Rate it, review it and add it to your lists in Krater.
Titles and thumbnails from YouTube. Krater isn't affiliated with, endorsed by or sponsored by YouTube or Google.