DIGGING A SECRET TUNNEL Part 2
A video on YouTube. In Maker & Builds, a Krater category.
Watch on YouTubeSummary by Krater
Colin Furze continues his underground tunnel project by digging out the third to seventh sections beneath his shed, hitting the limestone seam and building a hydraulic ram system to push through stubborn rock, concluding with the framing of the shaft in April 2021 after a year and three months of work.
From the video
Answers: How do you dig an underground tunnel and install a hydraulic ram system?
- Underground tunnel construction
- Manual digging and muck removal
- Hydraulic ram and wedge tool fabrication
- Welding and metal fabrication
- Shaft framing and mesh installation
What it concludes
- Using a hydraulic ram and wedge tool helps push through stubborn limestone and rock when manual digging is no longer effective.
- Installing frame support around the walls prevents collapses and ensures vertical and horizontal alignment in the tunnel shaft.
- The tunnel shaft digging project reached completion down to maximum depth by April 2021, one year and three months after it started.
Rate it, review it and add it to your lists in Krater.
Titles and thumbnails from YouTube. Krater isn't affiliated with, endorsed by or sponsored by YouTube or Google.